September 2, 2008 ----------------- Version 1 of the Level 2 (L2) files for the First Young Metolius Ponderosa Pine site (US-Me5) were posted. Only gap-filled records were provided by Bav Law and team. October 12, 2008 ---------------- Version 1 of the Level 3 and 4 (L3 & L4) files for the US-Me5 site were posted. September 8, 2010 ----------------- Version 2 (V002) of the L2 gap-filled files were posted. The new files contain the same data and period of record as V001 but are reported in the network-wide AmeriFlux conventions. December 16, 2011 ----------------- Version 2 (V002) of the L2 "with gaps" files for US-Me5 were posted. Details on the processing of the original files provided by Bev Law and team by CDIAC to produce these V002 L2 files are provided at ftp://cdiac.ornl.gov/pub/ameriflux/data/Level2/Sites_ByName/Metolius_First_Young_Pine/gap_filled/report_Metolius_First_Young_Pine.html