Menu: Skip within this page

 

Rosetta-Orbiter ALICE Commissioning 1 & Comet C/2002 T7 (LINEAR) Raw Data

Status: ARCHIVED

Abstract: This data set contains CODMAC level 2 cometary, calibration, and instrument checkout data acquired by the Rosetta Orbiter ALICE UV Spectrometer during the first commissioning phase of the Rosetta mission, which occurred March 5, 2004 to June 6, 2004.

RO-C/CAL/X-ALICE-2-CVP1-V1.0 [Errata] Browse Download (14.3 MB)

Citation to use when referencing this data set: "Stern, S.A., et al., ROSETTA-ORBITER 2002T7/CAL/CHECK ALICE 2 CVP1 V1.0, RO-C/CAL/X-ALICE-2-CVP1-V1.0, ESA Planetary Science Archive and NASA Planetary Data System, 2010."

Useful links: